LYSIPPE - Formation Lean Management, Réduction des frais généraux

4M’s stability

Saturday 10 January 2009 by emmanuel

Exclusive :


4M’s Stability On The Job On The Gemba [1].

  • A five days workshop in a shop of your company.
    • Alternatively theory / immediate practice for the first two days,
    • Complements and specifics the next three days,
    • Methodology accompaniment and practice on the job and on the gemba for the 5 days,

4M’s are Material, Manpower, Machines, Methods. These are the 4 class for sorting root causes of problems in a manufacturing company. 4M’s stability is part of the foundation of Toyota Production System. A just in time system cannot survive more than six months to unstable 4M’s.

Contact us for more details.

[1Gemba is a Japanese word for shop floor


Home | Contact | Site Map | |

Follow site activity en  Follow site activity LEAN MANAGEMENT (English)  Follow site activity Products   ?

Site powered by SPIP 3.0.11 + AHUNTSIC

Site under construction

Site under construction

Warning: a technical problem (SQL server) is preventing access to this part of the site. Thank you for your patience.
Site under construction

Site under construction

Warning: a technical problem (SQL server) is preventing access to this part of the site. Thank you for your patience.
Site under construction

Site under construction

Warning: a technical problem (SQL server) is preventing access to this part of the site. Thank you for your patience.